projects

projects

Presently employs over 250 qualified, engineering and technical
personnel on a full time, permanent basis

a) All major Electrical Utilities in the State Of Qatar, (including KahraMaa, Qatar Petroleum, Ras Laffan and Messaied based Companies – Qatar Gas, ORYX GTL, Qatar Chemicals) and on a few instances within the Sultanate of Oman, Kingdom of Saudi Arabia.
b) Global, multi-national and large Electrical Contracting & Manufacturing Companies such as ABB, Siemens, Mitsubishi Corporation, Marubeni Corporation, Isolux Watt, Konstruktor as well as several reputed local/regional Contracting Companies such as Saudi Cables, Arabian Bemco, Buzwair Engineering, Galfar.
c) Several specialized large cable routes requiring route survey, design and engineering services, cable fault locating services (for many local Contracting Companies, especially for Qatar Petroleum in Halul Island).

POWER LINKS QATAR L.L.C has been commissioned by, and has successfully delivered projects for:

Contract/ Project Description

Cable Rating (kV) 

Location 

Client

 Period - Completed

1.

KAHRAMAA -GTC-735 D-2015 - PH 13 - EHV /HV  cables  termination Works at Primary substation.

66 /  11

Al Naeeja East

Larsen & Toubro

Oct-21

2.

KAHRAMAA - GTC/735C/2015 - Installation of EHV /HV  cables & termination Works inside substation. 

132/ 66/ 11

Umm Ebiriya , Al Murrah , Al  Waab, Umm Al Seenam , Al Mansoura & Luaib 

SIEMENS / Descon
Engineering company

 

Jul-21

3.

KAHRAMAA - LTC 1348-2018 - Replacement Of 33kv, 11kv Bus Duct To Cable Connection For Earthing Transformers.

33 / 11

Dhukhan,Umm Bab

MEKDEM HOLDING 

Jul-21

4.

 KAHRAMAA - LTC1352/2018 - EHV CABLE REPAIR & Maintenance Work.

upto 400 kV

Qatar

KAHRAMAA

Apr-21

5.

KAHRAMAA -  LTC1352/2018 - EHV Cable Diversion work.

132

Gharaffa Gulf Mall to Gharaffa South West SS  

KAHRAMAA

Mar-21

6.

QATAR PETROLEUM - NFEE- Installation of MV Cable laying,termination,jointing & testing works.

11

Raslaffan 

Consolidated Contractors Company

Dec-20

7.

ASHGHAL-Constuction of the New Orbital Highway  ( PO23)- J55 - MV & LV  Electrical Works.

11

Measieed

Conspel Qatar W.L.L

May-20

8.

ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY MV & LV cable trench excavation and backfilling works.

11

Measieed

Joannou & Paraskevaides -AVAXS.A. here

May-20

9.

ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY - Construction of indoor and outdoor substations and package substation plinths.

11

Measieed

Joannou & Paraskevaides -AVAXS.A. 

May-20

10.

 hereKAHRAMAA -CPC02 - PRELIMINARY PHASE WORKS, DEVELOPMENT OF INTERNAL SECURITY FORCES (ISF) CAMP AT AL DUHAIL - DESIGN, ENGINEERING, INSTALLATION, TESTING AND COMMISSIONING, STARTUP AND HANDOVER TO KAHRAMAA 11 KV OUTGOING FEEDER CABLES INSIDE PRIMARY SUBSTATIONS FOR PACKAGE.

11

DUHAIL - ISF CAMP

AKTOR S.A.-ALJABER ENGINEERING JV 

May-20

11.

KAHRAMAA -GTC-735 E-2015 - PH 13 - EHV /HV  Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation.

132/  11

Al Wukair 

Best & Betas Consortium

Oct-19

12.

Design and Build Contract for Tech 4 Building at  Supply, Installations Including Consultancy Services on All MV Cable Related Works. 

11

Qatar Foundation - Education City

Butec-Murray & Roberts JV 

Oct-19

13.

MIC - Provision of Gulf Chlorine 70 TPD Chlor·Alkali Plant - MEP Works at Mesaieed , Qatar as an Electrical and Instrumentation Subcontractor. 

11

Mesaieed

MANCO

Nov-19

14.

KAHRAMAA - GTC/808/2015 (LOT-2)  - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock.

11

Qatar

KAHRAMAA

Apr-19

15.

ASHGAHAL - Construction and Upgrading of Infrastructure of AI­MUNTAZAH street Extension BARWA Commercial Avenue - The Installation of  MV &LV Substation internal cables and  substation equipment.

11

BARWA

ROOTS Energy & Engineering Services WLL

Apr-19

16.

Qatalum ,MIC -Emergency Repair & Rectification of faulty  EHV cable.   

400 kV 

Mesaieed

GE Engineering

Mar-19

17.

KAHRAMAA - Lusail CP 24 - HV External Cable laying, Civil works, Cable Joints , Termination &Testing Works. 

66 kV

Lusail

Larsen & Toubro

Feb-19

18.

KAHRAMAA - GTC/371C/2010 - TERMINATION WORK OF 11KV CABLE SYSTEM AND ACCESSORIES FOR PHASE X SUBSTATIONS UNDER PACKAGE S-5 & S-8. 

11

Qatar 

Hyosung Corporation 

Sep-18

19.

ASHGHAL -Project­Contract 2&3 C2011-27  Construction of Qatar Primary Routes, North Road   Installation,Jointing & Termination,HV test on Power and pilot cables and Preparation of as built drawing & Coordination with Kahramaa for shut down works.

11

Abu Thilah

Intertek Trading & Contracting

Sep-18

20.

KAHRAMAA - GTC-642 B - 2014 -Phase 12,Civil and cable installation work for HV - Cable  Double circuit. 

66 kV 

Umm Salal - Bu Fasilah Cable Route

Larsen & Toubro

Jul-18

21.

KAHRAMAA -  GTC-643G/2014 -Phase 12 - Package S10 -Cables Laying, Termination, Support Installation, Testing & commissioning Works at Primary substation. 

132/33/11

RAF Metro S/S,  BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation.

National Contracting Company

May-18

22.

KAHRAMAA - LTC/459/2011-Diversion of New Doha "J"-New Doha "H" 66 kV F#1.

132/33/11

RAF Metro S/S,  BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation.

National Contracting Company

May-18

23.

GTC/371/2010,  Phase 10Installation & Commissioning of  HV Cable System. 

66/11

Qatar

Hyosung//Kahramaa

Feb-17

24.

NEW PORT PROJECT - [NPP0047] - SUPPLY, INSTALLATION, CABLING, TERMINATION AND TESTING & COMMISSIONING OF 22KV INFRASTRUCTURE WORKS.

22

NEW PORT 

Construction Development Company LLC

Jan-17

25.

Al SUWAIDI PAPER FACTORY-II- Supply, Installation, Inspection, and Test & Commissioning of Electrical systems.

11

Industrial Area

Al SUWAIDI PAPER FACTORY

Dec-16

26.

KAHRAMAA - GTC-560/2013 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock.

11

Qatar

KAHRAMAA

Dec-15

27.

KAHRAMAA - GTC-513/2013 - Call –Off Contract For Electricity Distribution Network Works.

11

Qatar

KAHRAMAA

Dec-15

DETAILS LIST OF  MAJOR COMPLETED PROJECT

Project /Contract Description

Cable Rating (kV) 

Location 

Client

Contract Period 

1.

GTC 964-2019 -REPAIR & Maintenance work of EHV Cable. 

33 - 400 

Qatar

Kahramaa

3 Yrs

2.

GTC-911/2018 - Lot 2  - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock.

11

Qatar

Kahramaa

2 Yrs

3.

GTC-735 E -2015 -PHASE 13 - Installation of EHV Cable Loop in Loop out works.

132

 Al Wajbah 2 S/S and Al Gharafa south West S/S  

BBC

1 Yrs

4.

GTC-735 E -2015 -PHASE 13 - Installation HV/EHV Cable works inside Substation.

132 / 11 

 Al Wajbah 2 , Old Airport 2 & Al Zubarah

BBC

1 Yrs

5.

QPR - DUKHAN ROAD (EAST Contract) -  Installation of 11kV and LV Cables including Termination and HV D.C. Test.   

11

Gharaffa

QD-SBG/Parson / KBR

5 Yrs

6.

LTC 1348-2018 Project - Replacement of 33kV,11 kV Bus Duct Cable connection for Earth Transformers.

33/11

Doha,Sailiyah

MEKDEM HOLDING 

1 Yr

7.

SUPPLY TO AW-LP-A-47
AL SUWAIDI TRD Al Rakb -  Substation equipment & Cabling works.

11

Al Rakb

ALI AL-SUWAIDI TRADING EST 

1 Yr

8.

REFURBISHMENT OF HMC PSYCHIATRIC HOSPITAL MAIN PACKAGE.

11

Umm Al Houl

MARINA TRADING & CONTRACTING

1 Yr

9.

GTC-735 C -2015 -PHASE 13 - Installation HV/Cable works inside Substation.

11

Wadi Al Sai,Industrial Area  & Luaib 

QEMC- ELECTRO MECHANICAL COMPANY W.L.L

1 Yrs

DETAIL LIST OF  ONGOING PROJECT 

Project /Contract Description

1.

GTC 964-2019 -REPAIR & Maintenance work of EHV Cable 

Cable Rating ( kV) 

33 - 400 

Location 

Qatar

Client

Kahramaa

Contract Period 

3 Yrs

Project /Contract Description

2.

GTC-911/2018 - Lot 2  - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock 

Cable Rating ( kV) 

11

Location 

Qatar

Client

Kahramaa

Contract Period 

2 Yrs

Project /Contract Description

3.

 GTC-735 E -2015 -PHASE 13 - Installation of EHV Cable Loop in Loop out works 

Cable Rating ( kV) 

132

Location 

 Al Wajbah 2 S/S and Al Gharafa south West S/S  

Client

BBC

Contract Period 

1 Yrs

Project /Contract Description

4.

GTC-735 E -2015 -PHASE 13 - Installation HV/EHV Cable works inside Substation

Cable Rating ( kV) 

132 / 11 

Location 

 Al Wajbah 2 , Old Airport 2 & Al Zubarah

Client

BBC

Contract Period 

1 Yrs

Project /Contract Description

5.

QPR - DUKHAN ROAD (EAST Contract) -  Installation of 11kV and LV Cables including Termination and HV D.C. Test   

Cable Rating ( kV) 

11

Location 

 Gharaffa

Client

QD-SBG/Parson / KBR

Contract Period 

5 Yrs

Project /Contract Description

6.

LTC 1348-2018 Project - Replacement of 33kV,11 kV Bus Duct Cable connection for Earth Transformers

Cable Rating ( kV) 

33/11

Location 

Doha,Sailiyah

Client

MEKDEM HOLDING 

Contract Period 

1 Yrs

Project /Contract Description

7.

SUPPLY TO AW-LP-A-47
AL SUWAIDI TRD Al Rakb -  Substation equipment & Cabling works

Cable Rating ( kV) 

11

Location 

Al Rakb

Client

ALI AL-SUWAIDI TRADING EST 

Contract Period 

1 Yr

Project /Contract Description

8.

REFURBISHMENT OF HMC PSYCHIATRIC HOSPITAL MAIN PACKAGE

Cable Rating ( kV) 

11 

Location 

Umm Al Houl

Client

MARINA TRADING & CONTRACTING

Contract Period 

1 Yrs

Project /Contract Description

9.

GTC-735 C -2015 -PHASE 13 - Installation HV/Cable works inside Substation

Cable Rating ( kV) 

11 

Location 

Wadi Al Sai,Industrial Area  & Luaib 

Client

QEMC- ELECTRO MECHANICAL COMPANY W.L.L

Contract Period 

1 Yrs

Project /Contract Description

1.

KAHRAMAA -GTC-735 D-2015 - PH 13 - EHV /HV  cables  termination Works at Primary substation.  

Cable Rating ( kV) 

66 /  11 

Location 

Al Naeeja East

Client

Larsen & Toubro

 Period - Completed

Oct-21

Project /Contract Description

2.

KAHRAMAA - GTC/735C/2015 - Installation of EHV /HV  cables & termination Works inside substation. 

Cable Rating ( kV) 

132/ 66/ 11

Location 

Umm Ebiriya , Al Murrah , Al  Waab, Umm Al Seenam , Al Mansoura & Luaib 

Client

SIEMENS / Descon
Engineering company

 Period - Completed

Jul-21

Project /Contract Description

3.

KAHRAMAA - LTC 1348-2018 - Replacement Of 33kv, 11kv Bus Duct To Cable Connection For Earthing Transformers.

Cable Rating ( kV) 

33 / 11

Location 

Dhukhan,Umm Bab

Client

MEKDEM HOLDING 

 Period - Completed

Jul-21

Project /Contract Description

4.

 KAHRAMAA - LTC1352/2018 - EHV CABLE REPAIR & Maintenance Work.

Cable Rating ( kV) 

upto 400 kV

Location 

Qatar

Client

KAHRAMAA

 Period - Completed

Apr-21

Project /Contract Description

5.

KAHRAMAA -  LTC1352/2018 - EHV Cable Diversion work.

Cable Rating ( kV) 

132

Location 

Gharaffa Gulf Mall to Gharaffa South West SS  

Client

KAHRAMAA

 Period - Completed

Mar-21

Project /Contract Description

6.

QATAR PETROLEUM - NFEE- Installation of MV Cable laying,termination,jointing & testing works.

Cable Rating ( kV) 

11

Location 

Raslaffan 

Client

Consolidated Contractors Company

 Period - Completed

Dec-20

Project /Contract Description

7.

ASHGHAL-Constuction of the New Orbital Highway  ( PO23)- J55 - MV & LV  Electrical Works.

Cable Rating ( kV) 

11

Location 

Measieed 

Client

Conspel Qatar W.L.L

 Period - Completed

May-20

Project /Contract Description

8.

ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY MV & LV cable trench excavation and backfilling works.

Cable Rating ( kV) 

11

Location 

Measieed 

Client

Joannou & Paraskevaides - AVAXS.A

 Period - Completed

May-20

Project /Contract Description

9.

ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY - Construction of indoor and outdoor substations and package substation plinths.

Cable Rating ( kV) 

11

Location 

Measieed

Client

Joannou & Paraskevaides -AVAXS.A

 Period - Completed

May-20

Project /Contract Description

10.

KAHRAMAA -CPC02 - PRELIMINARY PHASE WORKS, DEVELOPMENT OF INTERNAL SECURITY FORCES (ISF) CAMP AT AL DUHAIL - DESIGN, ENGINEERING, INSTALLATION, TESTING AND COMMISSIONING, STARTUP AND HANDOVER TO KAHRAMAA 11 KV OUTGOING FEEDER CABLES INSIDE PRIMARY SUBSTATIONS FOR PACKAGE.

Cable Rating ( kV) 

11

Location 

DUHAIL - ISF CAMP

Client

AKTOR S.A.-ALJABER ENGINEERING JV 

 Period - Completed

May-20

Project /Contract Description

11.

KAHRAMAA -GTC-735 E-2015 - PH 13 - EHV /HV  Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation. 

Cable Rating ( kV) 

132/  11

Location 

Al Wukair 

Client

Best & Betas Consortium

 Period - Completed

Oct-19

Project /Contract Description

12.

Design and Build Contract for Tech 4 Building at  Supply, Installations Including Consultancy Services on All MV Cable Related Works. 

Cable Rating ( kV) 

11

Location 

Qatar Foundation - Education City

Client

Butec-Murray & Roberts JV 

 Period - Completed

Oct-19

Project /Contract Description

13.

MIC - Provision of Gulf Chlorine 70 TPD Chlor·Alkali Plant - MEP Works at Mesaieed , Qatar as an Electrical and Instrumentation Subcontractor. 

Cable Rating ( kV) 

11

Location 

Mesaieed

Client

MANCO

 Period - Completed

Nov-19

Project /Contract Description

14.

KAHRAMAA - GTC/808/2015 (LOT-2)  - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock.

Cable Rating ( kV) 

11

Location 

Qatar

Client

KAHRAMAA

 Period - Completed

Apr-19

Project /Contract Description

15.

ASHGAHAL - Construction and Upgrading of Infrastructure of AI­MUNTAZAH street Extension BARWA Commercial Avenue - The Installation of  MV &LV Substation internal cables and  substation equipment. 

Cable Rating ( kV) 

11

Location 

BARWA

Client

ROOTS Energy & Engineering Services WLL

 Period - Completed

Apr-19

Project /Contract Description

16.

Qatalum ,MIC -Emergency Repair & Rectification of faulty  EHV cable.   

Cable Rating ( kV) 

400 kV 

Location 

Mesaieed

Client

GE Engineering

 Period - Completed

Mar-19

Project /Contract Description

17.

KAHRAMAA - Lusail CP 24 - HV External Cable laying, Civil works, Cable Joints , Termination &Testing Works.

Cable Rating ( kV) 

66 kV

Location 

Lusail

Client

Larsen & Toubro

 Period - Completed

Feb-19

Project /Contract Description

18.

KAHRAMAA - GTC/371C/2010 - TERMINATION WORK OF 11KV CABLE SYSTEM AND ACCESSORIES FOR PHASE X SUBSTATIONS UNDER PACKAGE S-5 & S-8. 

Cable Rating ( kV) 

11

Location 

Qatar 

Client

Hyosung Corporation 

 Period - Completed

Sep-18

Project /Contract Description

19.

ASHGHAL -Project­Contract 2&3 C2011-27  Construction of Qatar Primary Routes, North Road   Installation,Jointing & Termination,HV test on Power and pilot cables and Preparation of as built drawing & Coordination with Kahramaa for shut down works.

Cable Rating ( kV) 

11

Location 

Abu Thilah

Client

Intertek Trading & Contracting

 Period - Completed

Sep-18

Project /Contract Description

20.

KAHRAMAA - GTC-642 B - 2014 -Phase 12,Civil and cable installation work for HV - Cable  Double circuit.  

Cable Rating ( kV) 

66 kV 

Location 

Umm Salal - Bu Fasilah Cable Route 

Client

Larsen & Toubro

 Period - Completed

Jul-18

Project /Contract Description

21.

KAHRAMAA -  GTC-643G/2014 -Phase 12 - Package S10 -Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation. 

Cable Rating ( kV) 

132/33/11

Location 

RAF Metro S/S,  BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation 

Client

National Contracting Company

 Period - Completed

May-18

Project /Contract Description

22.

KAHRAMAA - LTC/459/2011-Diversion of New Doha "J"-New Doha "H" 66 kV F#1.

Cable Rating ( kV) 

66

Location 

Qatar

Client

National Contracting Company

 Period - Completed

May-18

Project /Contract Description

23.

GTC/371/2010,  Phase 10Installation & Commissioning of  HV Cable System. 

Cable Rating ( kV) 

66/11

Location 

Qatar

Client

Hyosung//Kahramaa

 Period - Completed

Feb-17

Project /Contract Description

24.

NEW PORT PROJECT - [NPP0047] - SUPPLY, INSTALLATION, CABLING, TERMINATION AND TESTING & COMMISSIONING OF 22KV INFRASTRUCTURE WORKS.

Cable Rating ( kV) 

22

Location 

NEW PORT 

Client

Construction Development Company LLC

 Period - Completed

Jan-17

Project /Contract Description

25.

Al SUWAIDI PAPER FACTORY-II- Supply, Installation, Inspection, and Test & Commissioning of Electrical systems.

Cable Rating ( kV) 

11

Location 

Industrial Area

Client

Al SUWAIDI PAPER FACTORY

 Period - Completed

Dec-16

Project /Contract Description

26.

KAHRAMAA - GTC-560/2013 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock.

Cable Rating ( kV) 

11

Location 

Qatar

Client

KAHRAMAA

 Period - Completed

Dec-15

Project /Contract Description

27.

KAHRAMAA - GTC-513/2013 - Call –Off Contract For Electricity Distribution Network Works.

Cable Rating ( kV) 

11

Location 

Qatar

Client

KAHRAMAA

 Period - Completed

Dec-15