a) All major Electrical Utilities in the State Of Qatar, (including KahraMaa, Qatar Petroleum, Ras Laffan and Messaied based Companies – Qatar Gas, ORYX GTL, Qatar Chemicals) and on a few instances within the Sultanate of Oman, Kingdom of Saudi Arabia.
b) Global, multi-national and large Electrical Contracting & Manufacturing Companies such as ABB, Siemens, Mitsubishi Corporation, Marubeni Corporation, Isolux Watt, Konstruktor as well as several reputed local/regional Contracting Companies such as Saudi Cables, Arabian Bemco, Buzwair Engineering, Galfar.
c) Several specialized large cable routes requiring route survey, design and engineering services, cable fault locating services (for many local Contracting Companies, especially for Qatar Petroleum in Halul Island).
POWER LINKS QATAR L.L.C has been commissioned by, and has successfully delivered projects for:
Contract/ Project Description | Cable Rating (kV) | Location | Client | Period - Completed | |
1. | KAHRAMAA -GTC-735 D-2015 - PH 13 - EHV /HV cables termination Works at Primary substation. | 66 / 11 | Al Naeeja East | Larsen & Toubro | Oct-21 |
2. | KAHRAMAA - GTC/735C/2015 - Installation of EHV /HV cables & termination Works inside substation. | 132/ 66/ 11 | Umm Ebiriya , Al Murrah , Al Waab, Umm Al Seenam , Al Mansoura & Luaib | SIEMENS / Descon
| Jul-21 |
3. | KAHRAMAA - LTC 1348-2018 - Replacement Of 33kv, 11kv Bus Duct To Cable Connection For Earthing Transformers. | 33 / 11 | Dhukhan,Umm Bab | MEKDEM HOLDING | Jul-21 |
4. | KAHRAMAA - LTC1352/2018 - EHV CABLE REPAIR & Maintenance Work. | upto 400 kV | Qatar | KAHRAMAA | Apr-21 |
5. | KAHRAMAA - LTC1352/2018 - EHV Cable Diversion work. | 132 | Gharaffa Gulf Mall to Gharaffa South West SS | KAHRAMAA | Mar-21 |
6. | QATAR PETROLEUM - NFEE- Installation of MV Cable laying,termination,jointing & testing works. | 11 | Raslaffan | Consolidated Contractors Company | Dec-20 |
7. | ASHGHAL-Constuction of the New Orbital Highway ( PO23)- J55 - MV & LV Electrical Works. | 11 | Measieed | Conspel Qatar W.L.L | May-20 |
8. | ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY MV & LV cable trench excavation and backfilling works. | 11 | Measieed | Joannou & Paraskevaides -AVAXS.A. here | May-20 |
9. | ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY - Construction of indoor and outdoor substations and package substation plinths. | 11 | Measieed | Joannou & Paraskevaides -AVAXS.A. | May-20 |
10. | hereKAHRAMAA -CPC02 - PRELIMINARY PHASE WORKS, DEVELOPMENT OF INTERNAL SECURITY FORCES (ISF) CAMP AT AL DUHAIL - DESIGN, ENGINEERING, INSTALLATION, TESTING AND COMMISSIONING, STARTUP AND HANDOVER TO KAHRAMAA 11 KV OUTGOING FEEDER CABLES INSIDE PRIMARY SUBSTATIONS FOR PACKAGE. | 11 | DUHAIL - ISF CAMP | AKTOR S.A.-ALJABER ENGINEERING JV | May-20 |
11. | KAHRAMAA -GTC-735 E-2015 - PH 13 - EHV /HV Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation. | 132/ 11 | Al Wukair | Best & Betas Consortium | Oct-19 |
12. | Design and Build Contract for Tech 4 Building at Supply, Installations Including Consultancy Services on All MV Cable Related Works. | 11 | Qatar Foundation - Education City | Butec-Murray & Roberts JV | Oct-19 |
13. | MIC - Provision of Gulf Chlorine 70 TPD Chlor·Alkali Plant - MEP Works at Mesaieed , Qatar as an Electrical and Instrumentation Subcontractor. | 11 | Mesaieed | MANCO | Nov-19 |
14. | KAHRAMAA - GTC/808/2015 (LOT-2) - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock. | 11 | Qatar | KAHRAMAA | Apr-19 |
15. | ASHGAHAL - Construction and Upgrading of Infrastructure of AIMUNTAZAH street Extension BARWA Commercial Avenue - The Installation of MV &LV Substation internal cables and substation equipment. | 11 | BARWA | ROOTS Energy & Engineering Services WLL | Apr-19 |
16. | Qatalum ,MIC -Emergency Repair & Rectification of faulty EHV cable. | 400 kV | Mesaieed | GE Engineering | Mar-19 |
17. | KAHRAMAA - Lusail CP 24 - HV External Cable laying, Civil works, Cable Joints , Termination &Testing Works. | 66 kV | Lusail | Larsen & Toubro | Feb-19 |
18. | KAHRAMAA - GTC/371C/2010 - TERMINATION WORK OF 11KV CABLE SYSTEM AND ACCESSORIES FOR PHASE X SUBSTATIONS UNDER PACKAGE S-5 & S-8. | 11 | Qatar | Hyosung Corporation | Sep-18 |
19. | ASHGHAL -ProjectContract 2&3 C2011-27 Construction of Qatar Primary Routes, North Road Installation,Jointing & Termination,HV test on Power and pilot cables and Preparation of as built drawing & Coordination with Kahramaa for shut down works. | 11 | Abu Thilah | Intertek Trading & Contracting | Sep-18 |
20. | KAHRAMAA - GTC-642 B - 2014 -Phase 12,Civil and cable installation work for HV - Cable Double circuit. | 66 kV | Umm Salal - Bu Fasilah Cable Route | Larsen & Toubro | Jul-18 |
21. | KAHRAMAA - GTC-643G/2014 -Phase 12 - Package S10 -Cables Laying, Termination, Support Installation, Testing & commissioning Works at Primary substation. | 132/33/11 | RAF Metro S/S, BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation. | National Contracting Company | May-18 |
22. | KAHRAMAA - LTC/459/2011-Diversion of New Doha "J"-New Doha "H" 66 kV F#1. | 132/33/11 | RAF Metro S/S, BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation. | National Contracting Company | May-18 |
23. | GTC/371/2010, Phase 10Installation & Commissioning of HV Cable System. | 66/11 | Qatar | Hyosung//Kahramaa | Feb-17 |
24. | NEW PORT PROJECT - [NPP0047] - SUPPLY, INSTALLATION, CABLING, TERMINATION AND TESTING & COMMISSIONING OF 22KV INFRASTRUCTURE WORKS. | 22 | NEW PORT | Construction Development Company LLC | Jan-17 |
25. | Al SUWAIDI PAPER FACTORY-II- Supply, Installation, Inspection, and Test & Commissioning of Electrical systems. | 11 | Industrial Area | Al SUWAIDI PAPER FACTORY | Dec-16 |
26. | KAHRAMAA - GTC-560/2013 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock. | 11 | Qatar | KAHRAMAA | Dec-15 |
27. | KAHRAMAA - GTC-513/2013 - Call –Off Contract For Electricity Distribution Network Works. | 11 | Qatar | KAHRAMAA | Dec-15 |
Project /Contract Description | Cable Rating (kV) | Location | Client | Contract Period | |
1. | GTC 964-2019 -REPAIR & Maintenance work of EHV Cable. | 33 - 400 | Qatar | Kahramaa | 3 Yrs |
2. | GTC-911/2018 - Lot 2 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock. | 11 | Qatar | Kahramaa | 2 Yrs |
3. | GTC-735 E -2015 -PHASE 13 - Installation of EHV Cable Loop in Loop out works. | 132 | Al Wajbah 2 S/S and Al Gharafa south West S/S | BBC | 1 Yrs |
4. | GTC-735 E -2015 -PHASE 13 - Installation HV/EHV Cable works inside Substation. | 132 / 11 | Al Wajbah 2 , Old Airport 2 & Al Zubarah | BBC | 1 Yrs |
5. | QPR - DUKHAN ROAD (EAST Contract) - Installation of 11kV and LV Cables including Termination and HV D.C. Test. | 11 | Gharaffa | QD-SBG/Parson / KBR | 5 Yrs |
6. | LTC 1348-2018 Project - Replacement of 33kV,11 kV Bus Duct Cable connection for Earth Transformers. | 33/11 | Doha,Sailiyah | MEKDEM HOLDING | 1 Yr |
7. | SUPPLY TO AW-LP-A-47 | 11 | Al Rakb | ALI AL-SUWAIDI TRADING EST | 1 Yr |
8. | REFURBISHMENT OF HMC PSYCHIATRIC HOSPITAL MAIN PACKAGE. | 11 | Umm Al Houl | MARINA TRADING & CONTRACTING | 1 Yr |
9. | GTC-735 C -2015 -PHASE 13 - Installation HV/Cable works inside Substation. | 11 | Wadi Al Sai,Industrial Area & Luaib | QEMC- ELECTRO MECHANICAL COMPANY W.L.L | 1 Yrs |
Project /Contract Description | |
1. | GTC 964-2019 -REPAIR & Maintenance work of EHV Cable |
Cable Rating ( kV) 33 - 400 | |
Location Qatar | |
Client Kahramaa | |
Contract Period 3 Yrs |
Project /Contract Description | |
2. | GTC-911/2018 - Lot 2 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock |
Cable Rating ( kV) 11 | |
Location Qatar | |
Client Kahramaa | |
Contract Period 2 Yrs |
Project /Contract Description | |
3. | GTC-735 E -2015 -PHASE 13 - Installation of EHV Cable Loop in Loop out works |
Cable Rating ( kV) 132 | |
Location Al Wajbah 2 S/S and Al Gharafa south West S/S | |
Client BBC | |
Contract Period 1 Yrs |
Project /Contract Description | |
4. | GTC-735 E -2015 -PHASE 13 - Installation HV/EHV Cable works inside Substation |
Cable Rating ( kV) 132 / 11 | |
Location Al Wajbah 2 , Old Airport 2 & Al Zubarah | |
Client BBC | |
Contract Period 1 Yrs |
Project /Contract Description | |
5. | QPR - DUKHAN ROAD (EAST Contract) - Installation of 11kV and LV Cables including Termination and HV D.C. Test |
Cable Rating ( kV) 11 | |
Location Gharaffa | |
Client QD-SBG/Parson / KBR | |
Contract Period 5 Yrs |
Project /Contract Description | |
6. | LTC 1348-2018 Project - Replacement of 33kV,11 kV Bus Duct Cable connection for Earth Transformers |
Cable Rating ( kV) 33/11 | |
Location Doha,Sailiyah | |
Client MEKDEM HOLDING | |
Contract Period 1 Yrs |
Project /Contract Description | |
7. | SUPPLY TO AW-LP-A-47 |
Cable Rating ( kV) 11 | |
Location Al Rakb | |
Client ALI AL-SUWAIDI TRADING EST | |
Contract Period 1 Yr |
Project /Contract Description | |
8. | REFURBISHMENT OF HMC PSYCHIATRIC HOSPITAL MAIN PACKAGE |
Cable Rating ( kV) 11 | |
Location Umm Al Houl | |
Client MARINA TRADING & CONTRACTING | |
Contract Period 1 Yrs |
Project /Contract Description | |
9. | GTC-735 C -2015 -PHASE 13 - Installation HV/Cable works inside Substation |
Cable Rating ( kV) 11 | |
Location Wadi Al Sai,Industrial Area & Luaib | |
Client QEMC- ELECTRO MECHANICAL COMPANY W.L.L | |
Contract Period 1 Yrs |
Project /Contract Description | |
1. | KAHRAMAA -GTC-735 D-2015 - PH 13 - EHV /HV cables termination Works at Primary substation. |
Cable Rating ( kV) 66 / 11 | |
Location Al Naeeja East | |
Client Larsen & Toubro | |
Period - Completed Oct-21 |
Project /Contract Description | |
2. | KAHRAMAA - GTC/735C/2015 - Installation of EHV /HV cables & termination Works inside substation. |
Cable Rating ( kV) 132/ 66/ 11 | |
Location Umm Ebiriya , Al Murrah , Al Waab, Umm Al Seenam , Al Mansoura & Luaib | |
Client SIEMENS / Descon | |
Period - Completed Jul-21 |
Project /Contract Description | |
3. | KAHRAMAA - LTC 1348-2018 - Replacement Of 33kv, 11kv Bus Duct To Cable Connection For Earthing Transformers. |
Cable Rating ( kV) 33 / 11 | |
Location Dhukhan,Umm Bab | |
Client MEKDEM HOLDING | |
Period - Completed Jul-21 |
Project /Contract Description | |
4. | KAHRAMAA - LTC1352/2018 - EHV CABLE REPAIR & Maintenance Work. |
Cable Rating ( kV) upto 400 kV | |
Location Qatar | |
Client KAHRAMAA | |
Period - Completed Apr-21 |
Project /Contract Description | |
5. | KAHRAMAA - LTC1352/2018 - EHV Cable Diversion work. |
Cable Rating ( kV) 132 | |
Location Gharaffa Gulf Mall to Gharaffa South West SS | |
Client KAHRAMAA | |
Period - Completed Mar-21 |
Project /Contract Description | |
6. | QATAR PETROLEUM - NFEE- Installation of MV Cable laying,termination,jointing & testing works. |
Cable Rating ( kV) 11 | |
Location Raslaffan | |
Client Consolidated Contractors Company | |
Period - Completed Dec-20 |
Project /Contract Description | |
7. | ASHGHAL-Constuction of the New Orbital Highway ( PO23)- J55 - MV & LV Electrical Works. |
Cable Rating ( kV) 11 | |
Location Measieed | |
Client Conspel Qatar W.L.L | |
Period - Completed May-20 |
Project /Contract Description | |
8. | ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY MV & LV cable trench excavation and backfilling works. |
Cable Rating ( kV) 11 | |
Location Measieed | |
Client Joannou & Paraskevaides - AVAXS.A | |
Period - Completed May-20 |
Project /Contract Description | |
9. | ASHGHAL-DESIGN & CONSTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY - Construction of indoor and outdoor substations and package substation plinths. |
Cable Rating ( kV) 11 | |
Location Measieed | |
Client Joannou & Paraskevaides -AVAXS.A | |
Period - Completed May-20 |
Project /Contract Description | |
10. | KAHRAMAA -CPC02 - PRELIMINARY PHASE WORKS, DEVELOPMENT OF INTERNAL SECURITY FORCES (ISF) CAMP AT AL DUHAIL - DESIGN, ENGINEERING, INSTALLATION, TESTING AND COMMISSIONING, STARTUP AND HANDOVER TO KAHRAMAA 11 KV OUTGOING FEEDER CABLES INSIDE PRIMARY SUBSTATIONS FOR PACKAGE. |
Cable Rating ( kV) 11 | |
Location DUHAIL - ISF CAMP | |
Client AKTOR S.A.-ALJABER ENGINEERING JV | |
Period - Completed May-20 |
Project /Contract Description | |
11. | KAHRAMAA -GTC-735 E-2015 - PH 13 - EHV /HV Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation. |
Cable Rating ( kV) 132/ 11 | |
Location Al Wukair | |
Client Best & Betas Consortium | |
Period - Completed Oct-19 |
Project /Contract Description | |
12. | Design and Build Contract for Tech 4 Building at Supply, Installations Including Consultancy Services on All MV Cable Related Works. |
Cable Rating ( kV) 11 | |
Location Qatar Foundation - Education City | |
Client Butec-Murray & Roberts JV | |
Period - Completed Oct-19 |
Project /Contract Description | |
13. | MIC - Provision of Gulf Chlorine 70 TPD Chlor·Alkali Plant - MEP Works at Mesaieed , Qatar as an Electrical and Instrumentation Subcontractor. |
Cable Rating ( kV) 11 | |
Location Mesaieed | |
Client MANCO | |
Period - Completed Nov-19 |
Project /Contract Description | |
14. | KAHRAMAA - GTC/808/2015 (LOT-2) - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock. |
Cable Rating ( kV) 11 | |
Location Qatar | |
Client KAHRAMAA | |
Period - Completed Apr-19 |
Project /Contract Description | |
15. | ASHGAHAL - Construction and Upgrading of Infrastructure of AIMUNTAZAH street Extension BARWA Commercial Avenue - The Installation of MV &LV Substation internal cables and substation equipment. |
Cable Rating ( kV) 11 | |
Location BARWA | |
Client ROOTS Energy & Engineering Services WLL | |
Period - Completed Apr-19 |
Project /Contract Description | |
16. | Qatalum ,MIC -Emergency Repair & Rectification of faulty EHV cable. |
Cable Rating ( kV) 400 kV | |
Location Mesaieed | |
Client GE Engineering | |
Period - Completed Mar-19 |
Project /Contract Description | |
17. | KAHRAMAA - Lusail CP 24 - HV External Cable laying, Civil works, Cable Joints , Termination &Testing Works. |
Cable Rating ( kV) 66 kV | |
Location Lusail | |
Client Larsen & Toubro | |
Period - Completed Feb-19 |
Project /Contract Description | |
18. | KAHRAMAA - GTC/371C/2010 - TERMINATION WORK OF 11KV CABLE SYSTEM AND ACCESSORIES FOR PHASE X SUBSTATIONS UNDER PACKAGE S-5 & S-8. |
Cable Rating ( kV) 11 | |
Location Qatar | |
Client Hyosung Corporation | |
Period - Completed Sep-18 |
Project /Contract Description | |
19. | ASHGHAL -ProjectContract 2&3 C2011-27 Construction of Qatar Primary Routes, North Road Installation,Jointing & Termination,HV test on Power and pilot cables and Preparation of as built drawing & Coordination with Kahramaa for shut down works. |
Cable Rating ( kV) 11 | |
Location Abu Thilah | |
Client Intertek Trading & Contracting | |
Period - Completed Sep-18 |
Project /Contract Description | |
20. | KAHRAMAA - GTC-642 B - 2014 -Phase 12,Civil and cable installation work for HV - Cable Double circuit. |
Cable Rating ( kV) 66 kV | |
Location Umm Salal - Bu Fasilah Cable Route | |
Client Larsen & Toubro | |
Period - Completed Jul-18 |
Project /Contract Description | |
21. | KAHRAMAA - GTC-643G/2014 -Phase 12 - Package S10 -Cables Laying, termination, Support Installation,Testing & commissioning Works at Primary substation. |
Cable Rating ( kV) 132/33/11 | |
Location RAF Metro S/S, BAA4 S/S , Doha West Metro, BAA5 & Lusail Central Metro substation | |
Client National Contracting Company | |
Period - Completed May-18 |
Project /Contract Description | |
22. | KAHRAMAA - LTC/459/2011-Diversion of New Doha "J"-New Doha "H" 66 kV F#1. |
Cable Rating ( kV) 66 | |
Location Qatar | |
Client National Contracting Company | |
Period - Completed May-18 |
Project /Contract Description | |
23. | GTC/371/2010, Phase 10Installation & Commissioning of HV Cable System. |
Cable Rating ( kV) 66/11 | |
Location Qatar | |
Client Hyosung//Kahramaa | |
Period - Completed Feb-17 |
Project /Contract Description | |
24. | NEW PORT PROJECT - [NPP0047] - SUPPLY, INSTALLATION, CABLING, TERMINATION AND TESTING & COMMISSIONING OF 22KV INFRASTRUCTURE WORKS. |
Cable Rating ( kV) 22 | |
Location NEW PORT | |
Client Construction Development Company LLC | |
Period - Completed Jan-17 |
Project /Contract Description | |
25. | Al SUWAIDI PAPER FACTORY-II- Supply, Installation, Inspection, and Test & Commissioning of Electrical systems. |
Cable Rating ( kV) 11 | |
Location Industrial Area | |
Client Al SUWAIDI PAPER FACTORY | |
Period - Completed Dec-16 |
Project /Contract Description | |
26. | KAHRAMAA - GTC-560/2013 - Call off Contract For Distribution Cable Fault Location (LV) and Repairs (MV&LV) Round The Clock. |
Cable Rating ( kV) 11 | |
Location Qatar | |
Client KAHRAMAA | |
Period - Completed Dec-15 |
Project /Contract Description | |
27. | KAHRAMAA - GTC-513/2013 - Call –Off Contract For Electricity Distribution Network Works. |
Cable Rating ( kV) 11 | |
Location Qatar | |
Client KAHRAMAA | |
Period - Completed Dec-15 |